Milestone
Turnover Crosses ₹8.96 Cr In FY 2025–26
A 144% year-on-year jump — the company's strongest financial year since incorporation, powered by CGD and solar-infra order wins.

Milestone
A 144% year-on-year jump — the company's strongest financial year since incorporation, powered by CGD and solar-infra order wins.
Project Update
MDPE laying and CNG/PNG connection works advancing on the HPCL network with partners Rudra Gas Enterprise and Shree Ganesh Construction.
Expansion
Pile foundations and precast boundary walls in execution for Juniper Green at Tuljapur (Maharashtra) and Mandsaur (Madhya Pradesh).
Handover
₹4.62 Cr of MDPE, GI and civil works delivered for AG&P Pratham (Allegiant Infra) — extending PNG reach across Jodhpur.
Engineering
When a pipeline must cross a railway, a highway or a living street, trenchless HDD keeps the surface — and the city — moving. Here is how we decide between the drill and the digger.
CGD Explained
Steel mains, MDPE distribution, PE LMC service lines, GI risers and pressure testing — the full journey of piped natural gas, and why testing (PPT) is the step that earns trust.
Highways
Before a four-lane corridor rises, the water lines beneath it must move. Lessons from our NHAI-linked packages in Himachal, Rajasthan and Madhya Pradesh.
Pipeline Stringing
MS Pipe Crossing
HDD Trenchless Rig
Ajax Mixer Fleet
UG Cable — Urban
Cable Drums Staged
Open Trench Laying
OFC Duct Pulling
Pole Erection
Cable Jointing
Pressure Testing
Route Survey
MDPE HDD Bore
MDPE Fittings
PNG Connection
Bulk Earthwork
Raft Reinforcement
Precast Wall
Pile Foundation
Foundation Block
Ground-Mount Array
Rooftop System
Turnover history, project ledger, registrations and banking details — everything in our official company profile.